A company currently using an inspection process in its material receiving department is trying to in

A company currently using an inspection process in its material receiving department is trying to install an overall cost reduction program. One possible reduction is the elimination of one inspection position. This position tests items for which the probability of a material defect averages 0.01. By inspecting all items, the inspector is able to remove all defects. The inspector can inspect 55 units per hour. The hourly rate including fringe benefits for this position is $10. If the inspection position is eliminated, defects will go into product assembly and will have to be replaced later at a cost of $11 each when they are detected in final product testing Assume that the line will operate at the same rate (i.e., the inspection rate) if the inspection operation was eliminated a-1. If the inspector position is eliminated, what will the hourly cost of defects be? (Round your answer to 2 decimal places.) Cost per hour a-2. Should this inspection position be eliminated based on costs alone? $6.05 O Yes No b. What is the cost to inspect each unit? (Round your answer to 2 decimal places.) Cost per unit5.50 c. Is there benefit (or loss) from the current inspection process? How much? (Input all amounts as positive values. Round your answers to 2 decimal places.) Hourly $ 3.95 Per unit $13.92 Loss

A company currently using an inspection process in its material receiving department is trying to install an overall cost reduction program. One possible reduction is the elimination of one inspection position. This position tests items for which the probability of a material defect averages 0.01. By inspecting all items, the inspector is able to remove all defects. The inspector can inspect 55 units per hour. The hourly rate including fringe benefits for this position is $10. If the inspection position is eliminated, defects will go into product assembly and will have to be replaced later at a cost of $11 each when they are detected in final product testing Assume that the line will operate at the same rate (i.e., the inspection rate) if the inspection operation was eliminated a-1. If the inspector position is eliminated, what will the hourly cost of defects be? (Round your answer to 2 decimal places.) Cost per hour a-2. Should this inspection position be eliminated based on costs alone? $6.05 O Yes No b. What is the cost to inspect each unit? (Round your answer to 2 decimal places.) Cost per unit5.50 c. Is there benefit (or loss) from the current inspection process? How much? (Input all amounts as positive values. Round your answers to 2 decimal places.) Hourly $ 3.95 Per unit $13.92 Loss

Looking for a similar assignment? Get help from our qualified experts!

"Our Prices Start at $9.99. As Our First Client, Use Coupon Code GET15 to claim 15% Discount This Month!!":

Order a Similar Paper Order a Different Paper