Group Assignment For point No.1 – Since the group numbers are large you should cover multiple…

Group Assignment

For point No.1 – Since the group numbers are large you should cover multiple buildings (e.g. domestic house and shop lot or

Another building)

For point No.2 – Your group assignment should cover superstructure elements (Columns, beams, ground floor slabs, staircase,

Roofs (including car porch and any extended roofs), walls (external and internal walls) and upper floors

This is group assisgment.

Subject :BUILDING TECHNOLOGY

I need a write up on the electrical connection… i have attached all the drawing and document… need to link and advise the sugesstion for electrical requirement

Looking for a similar assignment? Get help from our qualified experts!

"Our Prices Start at $9.99. As Our First Client, Use Coupon Code GET15 to claim 15% Discount This Month!!":

Order a Similar Paper Order a Different Paper